Products
JSJ-GL-type of climbing frame intelligent control box
The lower end of the control panel of control box distributed six months air plugs, respectively sensors, communications into, communication out of control into the control-out and lift motor. Display panel with four LED digital tube is used to display the current weight and programming information, four buttons are: setting, shift the addend and cleared for parameter setting.
Parameter setting method:
1, in the normal display mode, press the Set button to enter the parameter setting mode, the cursor display Cin, ask for the password.
2, after the password is entered, press the Set button to enter the overload early warning (SAL), if you want to modify the parameters, press the Shift key to enter, and through the shift key and the key on the flashing digit addends modify, press the Set button to save . Otherwise, press the Set button to skip.
3, the modification is complete, press the Set button to enter the overload shutdown (SAH), parameter settings as above.
4, press the Set button to enter the missing Airborne Early Warning (SPL), parameter settings as above.
5, press the Set button to enter the lost set down (SPH), parameter settings as above.
6, press the Set button to enter the overload switch (CS), 0 is off, 1 is on, press the Shift key to enter, press the key addend changes, press the Set button to save. Otherwise, press the Set button to skip.
7, press the Set button to enter the lost set switch (SS), parameter settings as above.
8, press the Set button to enter the meter calibration status. Were zero (SL), full scale (SH) and decimal places (SD), this state without any user operation, press the Set button to skip, otherwise it will create sub-control data measurements are not allowed.
9, press the Set button to enter the machine-bit address (AD), press the Shift key to enter, press the key addend changes, press the Set button to save. Otherwise, press the Set button to skip.
Note: The same total control, the machine-bit address can not be repeated, is responsible for connecting the host machine, the same machine can not detect bit address data signals.
10, when the entire frame body After adjustment, press Clear key two seconds, achieved in accordance with the "tools of construction scaffolding safety technical specifications" requirement, a key to set all parameters.
11, when the sub-control instrument parameters adjustment disorder, you can hold down the Clear key three seconds, the automatic backup to restore the factory